CECAD PROJECTS

CECAD Projects List             Photos

SAN REMO RESIDENCE

Pacific Palisades, , CA
Paster Construction
New estate with New Guest House / Existing systems refit including AMX and Lutron, State of the Art Smart Home Technology / Complete Audio Video / Alarm and Surveillance systems / / Complete Site Manager Supervision / In progress Spring 2002

SANTA ROSA LANE RESIDENCE

Santa Barbara, CA

Buena Builders

Existing estate with New Guest House / Existing systems refit including AMX and Lutron, State of the Art Smart Home Technology / Complete Audio Video / Alarm and Surveillance systems / / Complete Site Manager Supervision / In progress Spring 2002

LA LANTERNE RESIDENCE

Bel Air, CA

Customer Direct

Install staged perimeter detection system on 3 acre existing estate / Interface to Security via AMX NetLinx / Provide web based control and system monitor / RF control for upgraded Lighting design Installations by CECAD / Complete Spring 2002

OAKMONT RESIDENCE 

Brentwood, CA

Paster Construction

Major electrical remodel / rewire for EMF concerns / Advanced GrafikEye Lighting controls with interface to  Security Systems / completed 2001 continued services provided

SEPULVEDA PASS RESIDENCE 

Sherman Oaks, CA

Customer Direct
Installed AMX/PHAST system not completed by others / designed custom shade control interface / installed XFM radio system / Interface with AMX and Alarm system  / HVAC dual stage controls / RF Touch Panel controls entire home

MUSEUM OF FLYING    Photos    2002

Santa Monica, CA

Installation of emergency egress lighting required by City of Santa Monica for occupancy compliance codes not applied to the space when originally built.

OCEAN AVENUE PENTHOUSE

Santa Monica, CA

Pardee Construction

Refit antiquated 12 year old central dimming  system with Lutron HomeWorks Interactive / Use of Lutron GP style commercial dimmer panels / Integrated with AMX system processor to provide wireless RF control throughout the space / To Complete by Winter 2001

HOTCHKIS RESIDENCE

Los Angeles, CA

Tiberio Construction

New Home Featuring  Lutron HomeWorks Interactive lighting controls / Environmental controls via AMX Landmark featuring Touch Panel Controls / Electrical system engineering by CECAD, Inc.  / To Complete by Winter 2001

J. WALLACE RESIDENCE

Los Angeles, CA

CECAD, Inc

Existing home refit with Lutron HomeWorks Interactive System over 30,0000 square feet, 250 loads and over 50 control stations replacing local and X-10 controls. All work performed via existing conduit systems/ Extensive use of GrafikEye 3500 series dimmer systems 

S. WALLACE RESIDENCE

Beverly Hills, CA

JD Group

New Home Featuring AMX and Lutron, State of the Art Smart Home Technology / Complete Audio Video / Alarm and Surveillance systems / Standby Generator  System w/Load Shedding / Complete Site Manager Supervision / To Complete by Winter 2001

MANN RESIDENCE

Alfred E. Mann

Beverly Hills, CA

Architect : Harry Holmes

Designer : Firestone James Interiors

Bernard Brothers Construction Company

New Home Featuring, State of the Art Smart Home Technology / Fiber Optic Installation / Computer Generated 3-D Architectural Walk-throughs / Engineering and Plan Check of all phases for computer driven environment / CADD training / Purchasing of computer hardware & software / Waterscape Lighting Design and Control / Calculite Rimless Recessed Lights / Computer Operated Motor Control / HVAC Interface / Stand-by power Generator System w/Load Shedding / Complete Site Manager Supervision / Completed Fall 1994

McNALL RESIDENCE

Bruce & Jane McNall

Los Angeles, CA

Architect : Harold Levitt

Unique Estates General Contractor

Remodel of entire Estate / Interior lighting, Art lighting / Exterior lighting, Fiber Optic pool lighting, Landscape lighting and Design / Complete Site Manager Supervision / Completed 1991 / Miscellaneous continued Services

SINATRA RESIDENCE

Frank and Barbara Sinatra

Malibu, CA

Architect : Edward Grenzbach

Quillin Construction Corporation

Complete project engineering / lighting design / Fiber Optic Lighting design and installations / Complete Site Manager Supervision

MILLER RESIDENCE

Robert L. and Kelly Miller

Los Angeles, CA

Jack Strauss General Contractors

Remodel 6000 sq. ft / Lighting Design / Class II Rewire / New 400 amp Service / Completed 1993 / Miscellaneous continued Services

FELDMAN RESIDENCE

Dr. Loren Feldman

Encino, CA

Architect: Tom Leishman
Leishman General Contractors, David Leishman

Addition to 5000 sq. ft Home / 400 amp Service Upgrade / Landscape Lighting Design and installations / Completed 1992 / Complete Site Manager Supervision

DALY RESIDENCE

Robert Daly

Los Angeles, CA

Designer: Ann Hood

Leishman General Contractors, David Leishman

Remodel / Interior Recessed lighting / Scenist Control System / Exterior pool & landscape / Professional Screening and Projection Room / Completed in 1990 / Complete Site Manager Supervision

TINKER RESIDENCE

Grant Tinker

Los Angeles, CA

Architect : Edward Grenzbach - Tom Leishman

Leishman General Contractors, Norman B. Leishman

Remodel / Landscape Lighting and Design / Interior recessed lighting / Battery back-up System installation / Miscellaneous continued Service / Completed 1990

ELHERS RESIDENCE

Lou Elhers

Los Angeles, CA

Designer : Ward Jewel

Jack Strauss General Contractors

Remodel / Art Lighting / Miscellaneous continued Service/Completed 1990

DANIELS RESIDENCE

Irwin Daniels

Beverly Hills, Ca

Lautenschlager Construction Inc.

New Home / Lightolier Litemode Dimming System / Calculite Rimless Recessed lighting / Completed 1989 / Complete Site Manager Supervision

PETRONI RESIDENCE

Los Angeles, CA

Jack Strauss General Contractors

Remodel / Completed 1988 / Miscellaneous continued Services / Complete Site Manager Supervision

LORIMAR PRODUCTIONS / EAST WEST CAPITAL

9570 Wilshire Blvd.

Beverly Hills, CA. 90210

Remodel / 1990 / Computer network wiring / New Location / Miscellaneous continued Service

ANDERLE RESIDENCE

Sherril & David Anderle

Los Angles, CA

Remodel 1989- Completed / Miscellaneous continued Services

LEWIS RESIDENCE

Sheri Lewis

Beverly Hills, CA

Designer: Louis Ortega

Mark Poulson General Contractor

Remodel / Completed 1988

RIKLIS RESIDENCE

Beverly Hills, Ca

Mark Poulson General Contractor

Remodel / 1988- Completed / Art Lighting / Interior and Exterior Lighting Design

COLEMAN RESIDENCE

Tom Coleman

Beverly Hills, Ca

MCN Construction

Remodel / Professional Projection and Screening Rooms / Control 1988- Completed / Landscape Lighting and Design / Miscellaneous continued Services / Complete Site Manager Supervision

PENNY RESIDENCE

Joe Penny

Toluca Lake, CA

Lyle Schnabel General Contractor

Remodel / 1987- Completed / Neon Design and Installation / Landscape Lighting and Design

WILLARD RESIDENCE

Dean and Rebecca Willard

Hidden Hills, CA

BYC Construction Company

Remote Control Lighting system control retrofit / Miscellaneous continued Services / Completed 1992

GUERIN RESIDENCE

Beverly Hills, CA

Architect : Gus Duffy

General Contractor : Lautenschlager Construction

Complete Electrical Engineering, Plan Check / Site Management / Stand-by Electrical Generator / Landscape Lighting Plan / Completed 1993 / NetWorks Lighting Control System / Miscellaneous continued Services

L.A. WEEKLY OFFICES

Los Angeles, CA

Electrical Installation in Historic Landmark Designated Building Formerly Hollywood Reporter offices / Completed 1994

STARK RESIDENCE

Ray Stark

Los Angeles, CA

Architect - Tom Leishman           Designer - Irwin Stroll

Leishman General Contractors - David Leishman

Complete Lighting Design for House Remodel / Coordination of Art Lighting Installation and Adjustment / Electrical Engineering

Completed 1993 / Miscellaneous continued Services

OSTIN RESIDENCE

Morris and Evelyn Ostin

Los Angeles, CA

Architect : Harry Newman

Fort Hill Construction

Lighting Design for House Remodel / Coordinated fixture and switching selections with owners and Design Team / Electrical Engineering Enhancement / Installation and Adjustment of all Electrical Systems / Lutron Homeworks System Design and Installation/ Completed August 1995

MYERSON RESIDENCE

Beverly Hills, CA

Architect : Charles T. Young P.C. Architects

Heinz Meier

Electrical Design and Engineering for new Beverly Hills Residence / Lighting Design and Co-ordination / Completed 1996

Construction / Stand By Power System / HomeWorks Lighting Control System

SUDIKOFF RESIDENCE

Los Angeles, CA

Architect : Choate Associates

Jack Strauss Construction

Electrical Installations / Complete Site Management / Lutron Homeworks Control System / Lighting System Co-Ordination

KECK / SANDERS RESIDENCE

La Lanterne

Los Angeles, CA

Strauss Construction

Miscellaneous continuing electrical services / Electrical Remodel / Complete Site Management

RIORDAN RESIDENCE

Richard Riordan

Los Angeles, CA

Electrical installations / Lighting System Design and coordination / Complete Site Management / Continuing services

BEVERLY GLEN RESIDENCE

Beverly Glen

Los Angeles, CA.

Electrical installations / Lighting and Control Systems coordination / Electrical Engineering / HomeWorks Lighting Control System / Completed Fall 1995

BROCOLLI RESIDENCE

Albert Brocolli

Beverly Hills, CA.

Carey Brothers Construction

Standby Power System design and Installation

GILLELAND RESIDENCE

North Ranch, CA.

Architect : Ronald G. Firestone

Interior Designers : Hendrix and Allardyce

Glass Development

System design and Installation / Electrical installations / Lighting and Control Systems Co-Ordination / Electrical Engineering / HomeWorks Lighting Control System / Currently Under Construction

IDEA HOUSE - PACIFIC DESIGN CENTER

PDC Green Building

West Hollywood, CA.

Thomas Lighting - Lutron Electronics - Ruggiero Design

Electrical Installations / Systems Co-Ordination for this State-of-the Art Design Model Residential Project

QDE / QWEST RECORDS

Quincy Jones / David Saltzman Productions

Burbank, CA.

Office Suite remodel

Bruce Mautner Construction

Electrical Installations for Office Remodel Project / Complete Lighting Design / Electrical Engineering / Title 24 Calculations / Cat5 MAC and TEL wiring Services / Continued Services

DOLBY LABORATORIES

Burbank, CA.

Electrical Installations for THX & DTS Theater Studio Laboratory Remodel Project

Completed Spring 1995

MINASSIAN AND ASSOCIATES

PDC Blue Green Building

West Hollywood, CA.

Design: Frank Austin

Lighting Installations and Design for Showroom

ALLEN / DEIBLE RESIDENCE

Sherman Oaks, CA.

Architect : Woodbury Design Group , Phil Melcher

Fitzgerald Construction

System design and Installation / Electrical installations / Lighting and Control Systems Co-Ordination / Electrical Engineering / HomeWorks Lighting Control System / Landscape Lighting Design and Installation / Completed Fall 1996 / Ongoing services

LOT 61 RESIDENCE

Beverly Park, CA.

Architect : Landry Design

Amir Construction

System design enhancements and Installation / Electrical installations / Lighting and Control Systems Co-Ordination / Electrical Engineering / HomeWorks Lighting Control System / Standby Power Systems / Currently Under Construction

PEASLEE-PARKER RESIDENCE

Beverly Hills, CA.

Architect: Ubatomo

Electrical installations / Completed Fall 1996

KATABI RESIDENCE

Calabasas, CA.

Architect: Gary W. Gepner

Design and Installation of Lutron HomeWorks Control System

MARCIANO RESIDENCE

Beverly Hills, CA.

Design and Installation of Lutron HomeWorks Control System

GEFFEN RESIDENCE

Beverly Hills, CA.

Architect: Debbie Nevin

Electrical installations to a nine acre estate / Currently Under Construction / 2000 amp Service upgrade / Security, CCTV systems, for entire property / Provisional Standby Power Systems / Landscape Lighting Control System Design and Installation

HAIMOVITZ RESIDENCE

Beverly Hills, CA.

Architect : Richard Mervis

Matlaff Construction

System design and Installation / Electrical installations / Lighting and Control Systems Co-Ordination / Electrical Engineering / HomeWorks Lighting Control System / Completed Fall 1996

THOMPSON RESIDENCE

Lake Sherwood, CA..

Design and Installation of a Lutron HomeWorks Lighting Control System for a 200 acre estate.

REINER RESIDENCE

Brentwood, Ca

Fort Hill Construction

Lighting redesign and improvements/ Cut in additional lighting to existing areas/ Misc. electrical services/ Completed Fall 1995

ZAPPA RESIDENCE

Toluca Lake, CA

Winston Chappel Architect

Lighting redesign and improvements/ Cut in additional lighting to existing areas/ Misc. electrical services/ 70 seat home and live performance theater / Control System and Design / Fiber Optic Star field Ceiling / Service Planning and Engineering

EISNER RESIDENCE

Bel Air, CA

Lighting redesign and improvements/ Cut in additional lighting to existing areas/ Misc. electrical services/ Completed Fall 1995

DICKENSON RESIDENCE

Northridge , CA

Lighting redesign and improvements/ Cut in additional lighting to existing areas/ Misc. electrical services/ Completed Fall 1995

LARIAN RESIDENCE

Beverly Hills, CA

System design and Installation / Electrical installations / Lighting and Control Systems Co-Ordination / Electrical Engineering / HomeWorks Lighting Control System / Landscape Lighting Design and Installation / Completed Fall 1996 / Ongoing services

WONG RESIDENCE

Westwood, CA

Electrical system design and installation of a high-rise condominium, system includes advanced Luton Grafik-eye lighting control system.

YAMAGATA RESIDENCE

Bel Air, CA

Major Home addition and  remodel

Bruce Mautner Construction

Lighting redesign and improvements/ Cut in additional lighting to existing areas/ landscape and security lighting/ Misc. electrical services/ in progress

GETTY RESIDENCE

Universal City, CA

Remodel of existing house, upgrading main service/ Lighting redesign and improvements/ Cut in additional lighting to existing areas/ Misc. electrical services/ Key Telephone System / Completed winter 1996

SARBONE RESIDENCE

Beverly Hills, CA

Remodel of existing house/ Lighting redesign and improvements/ Cut in additional lighting to existing areas/ Misc. electrical services/ Completed summer 1996

AMALFI RESIDENCE

Pacific Palisades, CA

New construction of custom residence/ Lighting redesign and improvements/ Installation of Lutron HomeWorks lighting control system Misc. electrical services/ In progress.

LOREN STREET SCHOOL

Northridge, CA

installed new class room communication system to 20 classrooms / Novell Network wiring and administration Assistance / Completed summer 1996

BIRMINGHAM HIGH SCHOOL

Van Nuys , CA

Installation of new power distribution panel and Miscellaneous electrical service.

STERN RESIDENCE

Westwood, CA

Electrical system design and installation of a high-rise condominium, system includes advanced Lutron GrafikEye lighting control system.

GEORGE RESIDENCE

Brentwood, CA

Lighting redesign and improvements/ Cut in additional lighting to existing areas/ Misc. electrical services/ advanced Lutron GrafikEye lighting control system / Completed winter 1996

EVENSEN RESIDENCE

Flintridge, CA

Light Touch Lighting control system installation/ Landscape lighting design and installation/ Misc. electrical services/ In progress

GRISAMORE RESIDENCE

Malibu, CA

Lighting redesign and improvements/ Cut in additional lighting to existing areas/ Misc. electrical services/ In progress.

RITZ CARLTON HOTEL

Marina Del Rey .CA

Design and updating installation of lighting control system for their 3 main banquet rooms.

GERBER RESIDENCE

Beverly Hills, CA

Upgrading of lighting control system/ Misc. electrical services1 / advanced Lutron GrafikEye lighting control system

GLOW STORE

Universal City, CA

Installation of lighting control system for specialty store/ Completed summer 1996

MERCIER RESIDENCE

West Hollywood, CA

Design and installation of landscape lighting and control system/ In progress

DEARKLAND RESIDENCE

Santa Barbara, CA

Installation of computerized lighting control system/ Installation of high end audio video system/ Completed winter 1996

WARNER BROTHERS STUDIOS

Burbank, CA

Lighting redesign and improvements to video editing departments/ Completed summer 1996

ZANUCK RESIDENCE

Beverly Hills, CA

Preliminary Design and installation of electrical system / 1989

    

Building a legacy of excellence